Thank you for reporting the site to the Town. We will be dispatching our inspector to the site to evaluate the sidewalk. Please allow us up to two weeks to conduct the inspection.
The Town currently repairs sidewalks based on the roads with the oldest complaints. Once we get to a street, we attempt to repair all sidewalk problems on the street. We are currently working on streets with complaints from 2007 and are about to begin 2008 streets. Based on current funding
and your street being a 2007 street, we will be addressing Central Avenue this year.
7 Comentários
Staff Engineer (Oficial Verificado)
a_non_mouse (Utilizador Registado)
Staff Engineer (Oficial Verificado)
Reconhecida Staff Engineer (Oficial Verificado)
a_non_mouse (Utilizador Registado)
a_non_mouse (Utilizador Registado)
Encerradas Engineering Inspector (Utilizador Registado)
and your street being a 2007 street, we will be addressing Central Avenue this year.