Descrizione
A temporary asphalt patch was applied to the concrete sidewalk at least 6 years ago, and it is cracked and bumpy. The asphalt patch needs to be replaced with concrete that matches the rest of the sidewalk.
A temporary asphalt patch was applied to the concrete sidewalk at least 6 years ago, and it is cracked and bumpy. The asphalt patch needs to be replaced with concrete that matches the rest of the sidewalk.
3 Commentos
Riconosciuto DC 311 (Utente registrato)
JTH (Utente registrato)
Chiusa DC 311 (Utente registrato)