说明
A temporary asphalt patch was applied to the concrete sidewalk at least 6 years ago, and it is cracked and bumpy. The asphalt patch needs to be replaced with concrete that matches the rest of the sidewalk.
A temporary asphalt patch was applied to the concrete sidewalk at least 6 years ago, and it is cracked and bumpy. The asphalt patch needs to be replaced with concrete that matches the rest of the sidewalk.
3 评论s
已确认 DC 311 (注册用户)
JTH (注册用户)
关闭 DC 311 (注册用户)